Measure E Projects

  • Adele Harrison Middle School Gym Locker Room and Performing Arts Modernization

    Preconstruction: 2018
    Construction: Spring 2020
    Funding source: Measure E

    Project: Complete

    Modernize the Girls Locker Room and Add Boys Locker Room. Modernize the Dance & Drama Classroom and Band Facilities.

    Altimira Middle School Altimira all weather Track and Field Improvements

    Preconstruction: 2018
    Construction: Summer 2019
    Funding source: Measure E

    Project: Complete

    Create an all weather track and field with lights for fall and winter use.

    Creekside High School Creekside Interior Modernization

    Preconstruction: 2018
    Construction: Summer 2019
    Funding source: Measure E

    Project: Complete

    Reconfigure common area inside for better instruction and flow 

    Dunbar Elementary School Add Stage and Storage room to Multi Purpose and Reconfigure Library/Comp lab to 21st Century Learning Center

    Preconstruction: 2021
    Construction: 2022
    Funding source: Measure E

    Add Stage and Storage Room to the Multi Purpose Building and Remodel Library and Computer Lab to a larger multi flexible learning environment with technology

    Dunbar Elementary School Add Sound Mitigation in the Multi Purpose

    Preconstruction: 2019
    Construction: 2019
    Funding source: Measure E

    Project: Complete

    Add Acoustic Panels in the Multi Purpose

    Dunbar Elementary School Septic System Replacement

    Preconstruction: 2018
    Construction: 2019
    Funding source: Measure E

    Project: Complete

    Dunbar Elementary School Toilet Room Modernization

    Preconstruction: 2018
    Construction: 2019
    Funding source: Measure E

    Project: Complete

    Remodel the Kindergarten and the Primary Building Toilet Rooms

    El Verano Elementary School New Multi-Use Building & New Drop Off/Parking

    Preconstruction: 2018
    Construction: 2020
    Funding source: Measure E

    Build new Multi Purpose building, move portables and remove old storage buildings. Create new Drop off at east side of campus 

    Flowery Elementary School Kindergarten Playground Improvements

    Preconstruction: Early 2019
    Construction: Spring 2019
    Funding source: Measure E

    Project: Completed

    Replace the turf at kindergarten playground

     

    Flowery Elementary School Staff Parking, Multi Purpose and Library Modernization

    Preconstruction: 2018
    Construction: Summer 2019
    Funding source: Measure E

    Project: Complete

    Site work to create staff parking with more stalls. Renovate Multi Purpose and add Table Storage Room.

    Prestwood Elementary School Add Stage, Kitchen and Storage to Multi Purpose

    Preconstruction: Mid-2020
    Construction: 2022
    Funding source: Measure E

    Add Stage, Kitchen and Storage to Multi Purpose

    Sassarini Elementary School Site Lighting Replacement and Parking Lighting additions

    Preconstruction: 2018
    Construction: Spring 2019
    Funding source: Measure E

    Project: Complete

    Retrofit existing lighting and add site lighting in parking lot where none occurs

    Sassarini Elementary School New Multi-Use Building with Indoor and Outdoor Stage

    Preconstruction: 2020
    Construction: 2023
    Funding source: Measure E

    Replace the existing Multi Purpose Building that will include new kitchen and an indoor/outdoor stage. 

    Sonoma Charter School Classroom Replacement Phase 1

    Preconstruction: 2018
    Construction: Summer 2019
    Funding source: Measure E

    Project: Complete 2020

    Replace old portable buildings with new modular and portable buildings.

    SVHS Athletic Field

    Preconstruction: Current
    Construction: 2021
    Funding source: Measure E

    Renovate the existing baseball and softball fields and include all weather soccer & football field with lights and bleachers. 

    SVHS Library Renovations

    Preconstruction: 2018
    Construction: Completed
    Funding source: Measure E

    New Carpet, Paint, Furniture and Technology

    SVHS Pool

    Preconstruction: Current
    Construction: 2022
    Funding source: Measure E

    Provide Pool and associated storage and support facilities.

    SVHS Renovate Career Technical Shops and Culinary Classrooms

    Preconstruction: Current
    Construction: 2021
    Funding source: Measure E

    Renovate the Ag, Wood, Metal and Culinary classrooms to provide new 21st Century CTE flexible Classrooms and Shops 

    SVHS Science Wing Modernization

    Preconstruction: 2021
    Construction: 2023
    Funding source: Measure E

    Renovate science building to support technology and 21st century science programs

     

    Woodland Star Charter School Parking and New MPR

    Preconstruction: 2021
    Construction: 2023
    Funding source: Measure E